To store a newly built flue wall, one or (usually) few storage racks are offered. The newly built flue wall is picked up by the FTA using a so-called flue wall lifting beam from the flue wall building machine and set down inside one of the storage racks.
The racks are usually mounted on the floor and connected to a surrounding platform (by others) at the top of the newly built flue wall level.
In this above picture the flue walls are set on concrete. Optionally, they can be put on steel frames. But in this current offer we have considered a situation like in the picture.