REEL adventure

Here comes a new decade and REEL teams are proud to have participated or to participate at some major industrial projects and is looking forward to some new challenges for the years to come…!

Great videos or documentary on these projects right below.

Manufacturing an Airbus A350

aeronautics

REEL delivered the monitoring system, tools and access equipment for the assembly line, providing innovative solutions with commitments on performance : production rates, total cost of ownership.

ITER

ITER

ITER is one of the most ambitious energy projects in the world today and will be the first fusion device to produce net energy.

Our cranes will  move a 1500t part  ( weight of 4 fully loaded Boeing 747 )  and place it in the machine with a precision of 1 mm !

Hydro Karmoy Technology Pilot

Hydro's Karmoy technology pilot in full operation

Hydro started producing the first aluminium metal at the technology pilot in Karmøy, marking the start of verifying at an industrial scale the world’s most climate-and energy efficient aluminium technology.

Ship Loader and Ship Unloader

2500 tph alumina ship loader from REEL Alesa ready to be delivered !

Together towards performance !

VARD

The vessel has been fitted with our 550-tonne vertical lay tower capable of laying pipe in demanding conditions and at great depths. It also has an under-deck basket capacity of some 3,800 tonnes.

The equipment were delivered  under  our brandname IMECA , REEL’s brandname for offshore activities.

Join a dynamic group! we are always on the lookout for new talents!
Reel hire all over the world

REEL receives the first DNV ISO 19443 certificate

REEL becomes the first company in the world certified by DNV according to ISO 19443!

REEL at the 2022 SOLIDS Dortmund exhibition – Come and meet us!

Our teams are waiting for you 22 to 23 of June at the Dortmund exhibition center!

ITER : TOKAMAK ASSEMBLY | The big lift featuring REEL!

The first section of the plasma chamber was lifted and transferred from the assembly tool to the pit by REEL cranes.

ITER : TOKAMAK ASSEMBLY | The big lift featuring REEL!

The first section of the plasma chamber was lifted and transferred from the assembly tool to the pit by REEL cranes.