ITER : Load tests Heavyweight champion

The Assembly Hall, with its two giant tools  -REEL  2 overhead cranes – towering 20 metres above ground, is one of the most spectacular locations on the ITER site.

When a dummy load weighing as much as a fully loaded 747 is slowly upended, displaced and eventually installed into one of the tool’s wings, spectacular gives way to awesome.

Video 

Pour suivre l’avancée du projet ITER 

REEL wishes you a Merry Christmas and a Happy New Year !

REEL wishes you a Merry Christmas and a Happy New Year !

NKM Noell Special Cranes : Anode Management System for Line 6 Alba now operating

TOGETHER TOWARDS PERFORMANCE 

1959 : REEL’s “Jumbo” dig the Mont-Blanc tunnel

a

REEL : Airbus honours its top-performing

REEL was honored to receive the Airbus Performance & Quality Award in toolings Procurement.

Join a dynamic group! Reel hire all over the world