Full assembled Furnace Tending Assembly delivered successfully

Fully assembled Furnace Tending Assembly delivered successfully  to Hamburg, pre-cabled and tested in our workshop of La Rochelle in France.

One more example of our flexibility with this compact assembly.

The pictures show  the trolley loaded on SPMT and the trolley loaded on the crane bridge.

Join a dynamic group!
Reel hire all over the world

Philippe Frantz, elected président of the Nuclear Valley, pole of competitiveness of the French nuclear sector

Purpose-built bulk handling cranes from REEL-NKM Noell

Imeca tensioners : Best in class solution

Bourget Air Show : REEL in Air&Cosmos