Fully assembled Furnace Tending Assembly delivered successfully to Hamburg, prewired and tested in our workshop of La Rochelle in France.
One more example of our flexibility with this compact assembly.
The pictures show the trolley loaded on SPMT and the trolley loaded on the crane bridge.
REEL becomes the first company in the world certified by DNV according to ISO 19443!
Our teams are waiting for you 22 to 23 of June at the Dortmund exhibition center!
The first section of the plasma chamber was lifted and transferred from the assembly tool to the pit by REEL cranes.
The first section of the plasma chamber was lifted and transferred from the assembly tool to the pit by REEL cranes.