Alba Line 6 smelters : REEL Alesa’s successful startup of its latest pot feeding system

REEL Alesa is proud to announce the successful startup of the first pots of its latest HDPS™ pot feeding system at Alba Line 6 smelters.

This new achievement bring the total cumulated length of HPDS™ installed worldwide to the world record of  170 km with the biggest and longest HDPS™ ever installed;

Several decades of industrial development enabled us to design and perfect a wide array of technologies adapted to today’s modern smelter operation

Whether a hyper dense phase system (HDPS™), a pot feed dense phase system or a hybrid system, our specialists deliver solutions tailored to your specific needs.

Our fully automated pot feed systems improve safety at your facility while enhancing the performance of your reduction cells.

Due to their high adaptability, our potfeed solutions are used to retrofit existing smelters, replacing crane and vehicle feed. They are fully automated with continuous online feedback to reduce operational and maintenance costs

Join a dynamic group!
Reel hire all over the world

Philippe Frantz, elected président of the Nuclear Valley, pole of competitiveness of the French nuclear sector

Purpose-built bulk handling cranes from REEL-NKM Noell

Imeca tensioners : Best in class solution

Bourget Air Show : REEL in Air&Cosmos