Alba Line 6 smelters : REEL Alesa’s successful startup of its latest pot feeding system

REEL Alesa is proud to announce the successful startup of the first pots of its latest HDPS™ pot feeding system at Alba Line 6 smelters.

This new achievement bring the total cumulated length of HPDS™ installed worldwide to the world record of  170 km with the biggest and longest HDPS™ ever installed;

Several decades of industrial development enabled us to design and perfect a wide array of technologies adapted to today’s modern smelter operation

Whether a hyper dense phase system (HDPS™), a pot feed dense phase system or a hybrid system, our specialists deliver solutions tailored to your specific needs.

Our fully automated pot feed systems improve safety at your facility while enhancing the performance of your reduction cells.

Due to their high adaptability, our potfeed solutions are used to retrofit existing smelters, replacing crane and vehicle feed. They are fully automated with continuous online feedback to reduce operational and maintenance costs

Join a dynamic group! we are always on the lookout for new talents!
Reel hire all over the world

REEL receives the first DNV ISO 19443 certificate

REEL becomes the first company in the world certified by DNV according to ISO 19443!

REEL at the 2022 SOLIDS Dortmund exhibition – Come and meet us!

Our teams are waiting for you 22 to 23 of June at the Dortmund exhibition center!

ITER : TOKAMAK ASSEMBLY | The big lift featuring REEL!

The first section of the plasma chamber was lifted and transferred from the assembly tool to the pit by REEL cranes.

ITER : TOKAMAK ASSEMBLY | The big lift featuring REEL!

The first section of the plasma chamber was lifted and transferred from the assembly tool to the pit by REEL cranes.