Alba Line 6 smelters : REEL Alesa’s successful startup of its latest pot feeding system

REEL Alesa is proud to announce the successful startup of the first pots of its latest HDPS™ pot feeding system at Alba Line 6 smelters.

This new achievement bring the total cumulated length of HPDS™ installed worldwide to the world record of  170 km with the biggest and longest HDPS™ ever installed;

Several decades of industrial development enabled us to design and perfect a wide array of technologies adapted to today’s modern smelter operation

Whether a hyper dense phase system (HDPS™), a pot feed dense phase system or a hybrid system, our specialists deliver solutions tailored to your specific needs.

Our fully automated pot feed systems improve safety at your facility while enhancing the performance of your reduction cells.

Due to their high adaptability, our potfeed solutions are used to retrofit existing smelters, replacing crane and vehicle feed. They are fully automated with continuous online feedback to reduce operational and maintenance costs

NKM Noell Special Cranes : Anode Management System for Line 6 Alba now operating

TOGETHER TOWARDS PERFORMANCE 

1959 : REEL’s “Jumbo” dig the Mont-Blanc tunnel

a

REEL : Airbus honours its top-performing

REEL was honored to receive the Airbus Performance & Quality Award in toolings Procurement.

50-year anniversary of Airbus : REEL partner of the industrial performance

REEL has been working on several projects with Airbus and is proud to have successfully completed key projects.

Join a dynamic group! Reel hire all over the world