NKM NOELL Special Cranes, part of REEL  , proposes equipment which is part of the final assembly line process.

Folowing projects were developped :

  • the final assembly and test stations (FAL)  for the A380 in Toulouse ,
  • the  fuselage junction station of the A330 /A340 final assembly line,
  • the complete A350 final assembly line stations,
  • the flexibles access systems for the A350. 


A perfect knowledge of the maintenance process in aeronautics enables us to propose maintenance equipment optimising the process, the work and the safety of the users.

  • docking systems
  • suspended telescopic platforms -TPF-

Together with a safe environment for the work force and equipment,  these products enable easy and safe access to any part of the aircraft.

REEL Hamburg -Service Subsidiary

Our latest development is the foundation of our subsidiary REEL Hamburg which is in operation since the 1st of January 2016.

REEL Hamburg is the next milestone following our service strategy to expand our network in order to be close to our clients.

The goal of REEL Hamburg is to extend our activities and to support our clients in the northern area of Europe with the same manner and best praxis expertise as known to our clients.

REEL Hamburg will be supported by both, the headquarter of REEL and NKM NOEL Special Cranes, to be able to provide the same level of quality in all engineering matters as well.


NKM Noell and REEL ALESA will participate to TMS 2018 in Phoenix, March 11 – 15.

The event will draw more than 4,000 attendees and feature four full days of technical programming


we wish you the very best for 2018

Load tests : Lifting and moving four Boeing 747s

Successfully performed for the double overhead crane

Some news from ITER : Hooked! Big, powerful cranes need big, powerful hooks

Each hook has a lifting capacity of 375 tonnes.

Join a dynamic group! Reel hire all over the world